Hire an SEO Agency or Do It Yourself?
SEO agency or DIY: the four criteria that decide it, how to spot a bad offer, and why the answers your customers search for must come from your business.
Read the articleNovember 4, 2026 · 12 min read
If you want to hire a landing page designer, the project almost always runs through the same five steps: brief, concept, build, check on desktop and phone, approval and launch. How long it takes depends less on the build than on your material: the goal and the one action, the offer with a price, copy or an existing page, real proof, the legal pages, and where the form sends its data. German providers among the first 15 Google results for the German search “landingpage erstellen lassen” in early November 2026 list starting prices between 899 euros net and 2,000 euros one-off, and turnaround times from under 24 hours with a complete brief to a few weeks. Domain and hosting come on top. The third option next to an agency and a freelancer is an AI employee that builds the page from your material, checks it, and only launches it after you approve.
My position is clear: the era of expensive websites and agency pages is over. My landing pages are built by Ralf, an AI employee from my AI workforce who works for me from source material to the checked desktop and mobile version, this website included. How he works is on his page Build and Modernize a Website With AI. If you would rather build the page yourself, the building blocks and tools are in Create a Landing Page: Guide and Tools. If you need a whole website, read Getting a Website Built: Steps, Options.
Same process as for a website, only shorter: no navigation, no subpages.
| Step | Who supplies it | What exists at the end | Where it usually stalls |
|---|---|---|---|
| 1. Brief | you | one sentence on goal and action, offer, where visitors come from, material | "Make it look modern" instead of a goal |
| 2. Concept | provider or AI employee | order of sections, headline, button, form fields, measurement point | design is discussed before anyone knows what gets counted |
| 3. Build | provider or AI employee | the finished page with real content | copy and images do not arrive |
| 4. Check | provider or AI employee, you take a look | phone and desktop checked, form actually submitted | only ever looked at on a large screen |
| 5. Approval and launch | you approve | page live, measurement running | legal pages missing the day before launch |
Ralf's team page shows the same process in four stages, with launch only after approval, and adds a condition for ad landing pages that applies to every provider: the ad promise, page content, and measurement point must be set before the build starts.
Ralf's page draws the line like this: he takes on research, page concept, implementation, responsive checks, technical preparation, and a documented handover. You decide on positioning, new services, legal claims, sensitive customer data, and the actual launch.
An example from my own business, from October 22, 2026: three free downloads on kevinwelter.com each needed their own page as the target for ads, one of them a catalog of 140 tasks for AI employees. The brief came from Susi, my AI employee for Meta ads, the copy from Conny, my content editor-in-chief, and Ralf built the pages.
The brief was tight: no menu, no links except imprint and privacy, email field and button above the fold even on a small phone, a headline that repeats the ad, copy word for word from Conny's draft. Because the pages exist only for ads, they stay out of the search index.
The checks ran before launch and once more after it:
My request came in around 5 pm, with the approval to launch included. By 5:40 pm all three pages were live. It went that fast because fonts, colors, form, and newsletter connection of kevinwelter.com already existed, and the copy was finished. Ralf extended an existing website rather than starting from zero. A page with a new look takes longer; this example gives no number for that.
One detail shows what the limits are for: Ralf noticed that on another page the button sits below the screen edge on small phones. He changed nothing there, because the brief excluded that page, and reported the finding instead. The decision stays with me.
Provider claims range from "in less than 24 hours", explicitly only with a complete brief, existing content, and free capacity, to "usually within a few weeks". The difference lies in the material and the approvals, not in the building. Hand everything over on day one and you get the fast version, with an agency as with an AI employee.
The figures come from the providers' own pages, as of November 2026; the German providers quote in euros. A general breakdown of domain, hosting, and builder plans is in What Does a Website or Landing Page Cost?; this is only about the build.
| Route | One-off | Running | What you get for it |
|---|---|---|---|
| Agency or studio | four German provider pages from the search results: from 899 euros net, from 1,499 euros plus VAT, from 1,500 euros, from 2,000 euros; one gives 1,500 to 3,500 euros as its usual range | domain and hosting; changes at one provider 125 euros per hour or 49 euros in a monthly package, plus VAT | a finished page, usually with a set number of revision rounds |
| Freelancer | quote by scope or hourly rate; no verified comparison figure here | domain, hosting, changes as agreed | one contact person, speed depends on their workload |
| AI employee Ralf | no project fee | Ralf as a ready-made template in the Premium tier of my community at 149 US dollars a month, or build him yourself in the Standard tier at 5 US dollars a month (founding offer for the first 50 members, as of October 29, 2026); plus your AI subscription, for example Claude Pro from 17 US dollars a month billed annually, excluding tax; domain and hosting | a role that takes on every further page and every change, with approval staying with you |
A pure price comparison is lopsided. The agency delivers a finished page for its fee and carries the work to acceptance. With an AI employee you pay monthly for a role, not for a page, and you stay responsible for material and approval. Which Claude plan is enough for your workload is in Claude Pro or Max: Limits Explained, all Claude plans in Claude Pricing and Plans Explained.
To be fair: an AI employee does not replace an agency when several departments have a say, the page hooks into a shop or inventory system, or nobody in the business has time to approve. For everything else, the expensive agency page is no longer the default.
Six questions separate a quote from a guess:
The same test applies to an AI employee: it should flag missing information rather than invent it. Ralf's team page states that as a rule: no service, price, or review is invented.
How to measure after launch whether the page reaches its goal, and what to change then, is in Conversion Rate Optimization: Steps and Tests.
At German agencies and studios, starting prices on the provider pages range from 899 euros net to 2,000 euros one-off, as of November 2026, plus domain, hosting, and later changes. With an AI employee you pay no project fee, but an ongoing fee for the role and your AI subscription.
From under a day to a few weeks, depending on whether your material is complete on day one. For me, three landing pages on an existing website were live about 40 minutes after the request.
Goal and measurement point, the offer with a price, copy or raw material, real proof, legal pages, the form's destination, and a name for the approval. For an ad landing page, the ad copy as well.
Yes. A generator turns a short prompt into a template; an AI employee like Ralf works from sources, checks the result, and launches only after your approval. More on generators in AI Website Generators Compared.
Write your brief on one page: goal sentence, the one action, who and from where, offer, proof, legal pages, where the form sends its data, who approves. With that sheet you can collect quotes or hand it straight to an AI employee. Ralf and the other AI employees are available as tested templates in the Premium tier of my community AI Employee Framework. What comes after launch in maintenance and hosting is in Website Maintenance: Tasks, Checklist, Cost.
SEO agency or DIY: the four criteria that decide it, how to spot a bad offer, and why the answers your customers search for must come from your business.
Read the articleFrom empty chat to permanent AI hire: pick the task, create the personnel file, run the onboarding interview, do the trial task, make it permanent.
Read the article
Kevin Welter
Developer, IT architect, author of technical books (Kubernetes, cloud infrastructures) and speaker. Runs his business with an AI workforce of fifteen AI employees and shows solo business owners in his community how to hire their first AI employee.
Your first AI employee up and running within an hour
Join the community$5/month founding price, first 50 members